After everyone was assigned tasks we began construction. Here is the final parts of the garage I created with help from AJ. It is being aligned in its correct ordinance in relation to the house.
This view is a good view of the construction of the main house. The garage is just off to the left of the screen out of view. I am standing where the drive will soon be.
After the garage was complete, we added a few little details and some objects. Dan Lynch laid down the drive to connect it to the garage. I added a few blocks to the end of the driveway to hep complete it.
Here is a third view of the garage with the plant scenery to the side. Also there is a car, paper airplane, bookshelf, and poster in the garage to give it its completion.
This is a view of the entire compound from ground level. It is amazing what a team effort can build in a simulated three dimensional world.
This is the final overview of the house with everything completed. The garage, swimming pool, house, landscape, and driveway came together great.
No comments:
Post a Comment